Tagged default duration, project operations, project services Tip #1435: Update Dataverse user photo from Office 365 profile I think I just billed a client 8 hours instead of 1 just by following Linn’s tip.Ĭover image by anncapictures from Pixabay Change the parameter value from 60 to the preferred default duration (in minutes).Click on “setDefaultDurationOnCreate” handler.To change the default Duration value of Time Entry, edit the Quick Create form of the Time Entry table with the name “Create Time Entry”. When the new Time Entry is created in Dynamics 365 Project Operations, the default value is set to “1 hour”.īut unlike the default Duration value in the Appointment activity, the default Duration value in Time Entry can be configured. Today’s tip is no exception even though I know bupkis about Project Ops. Unlike me, he does not beat around the bush and goes for jugular: “if you need X do Y or go home”. Love the tips from Linn because they are short and precise.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |